Redondo Beach Unified School District

Geotechnical Investigation, Materials Testing and Inspection for District-Wide New Construction Projects at 9 Different Campuses (2015) The project consisted of new construction at nine different (9) campuses within the Redondo Beach Unified School District. Some of the improvements at the Redondo Union High School included the construction of a new student services building, gymnasium, swimming…

Lennox School District

Geotechnical Investigation and Soils and Materials Testing and Inspection for Construction of New Classroom Buildings at Four Different Campuses (2017) In early 2017, Lennox School District selected GAI as their geotechnical engineering consultant and DSA-approved testing and inspection laboratory to conduct a geotechnical investigation and during construction testing and inspection for four new one and…

Wiseburn Unified School District

Geotechnical Investigation, Materials Testing and Inspection for the Renovation and Conversion of a 4-Story Office Building at Da Vinci High School (2015-2018/Phase I; 2016-2018/Phase II) This unique and complex high school renovation project was completed in two phases. The proposed development for Phase I included the renovation of an existing four-story office building, to be…

Palos Verdes Peninsula Unified School District

Geotechnical Investigation, Soils and Materials Testing and Inspection for New Construction of a Class Building at Peninsula High School (2019) Palos Verdes Peninsula High School in Rolling Hills Estates, California proposed upgrades to its campus by adding a two-story building with six classrooms and a weight room. For the design phase, GAI performed site reconnaissance…

Bonita Unified School District

Geotechnical Investigation, and Soils and Materials Inspection and Testing Services for the District Office Renovation and Expansion Project (2018-2019) The project consisted of the renovation of the district building and the construction of additions to the building. The work included the demolition and replacement of flooring, walls, asphalt, and concrete for the construction of the…

Norwalk-La Mirada Unified School District

Materials Testing and Special Inspection Services for the La Mirada High School New Football Stadium Project (2020) The district’s construction program included new stadiums, new construction projects, modernization/reconstruction, and alterations. GAI provided geotechnical engineering consulting services for the La Mirada High School New Football Stadium Project. GAI conducted a comprehensive geotechnical and geohazard investigation and…

Long Beach Unified School District

Soils and Materials Testing and Inspection for the Lakewood High School Track and Field (2021) The Lakewood High School Track and Field Project consisted of the replacement of the existing track with an all-weather track surface, the replacement of the electronic scoreboard, the reconstruction of the existing bleachers to create accessible seating, and the replacement…

La Canada Unified School District

Geotechnical and Geohazard Investigation and Materials Testing and Inspection for New Outdoor Pool Facility and South Campus Improvement Project for La Canada High School (2020-2022) The project included the following improvements to the south campus of La Canada High School: a new outdoor swimming pool with an adjacent restroom/locker room/office building, new basketball courts to…

Irvine Unified School District

Geotechnical Investigation Testing for Bond Measure E Culverdale Elementary School Expansion Project (2022) The project included the construction of a new one-story Multi-Purpose Room (MPR) building and expanded food service/kitchen space, reconfiguration of the existing MPR into Student Services Space, and improvements to arrival and wayfinding. The new MPR building will have an area of…

El Segundo Unified School District

Geotechnical and Geohazard Investigation and Soils and Materials Testing and Inspection for New Gymnasium and Site Developments at El Segundo Middle School (2020-2023) The project included the design and construction of a new 14,000 square feet footprint gymnasium building, new basketball courts, new parking areas, retaining walls, and bleachers at the El Segundo Middle School.…